Daejon Plant 2018-01-09T10:05:30+00:00

No.1 Plant

The No. 1 plant is a hybrid concept plant that can perform both batch processes and high pressure continuous processes.

  • Production Start in 1999
  • 13 Batch Reactors (Total Capacity: 70m3)
  • Continuous Catalytic Hydrogenation System
  • 4 Nutsche Filter Dryers in Clean Room
  • Automatic Temperature & Pressure Control System for Plant Equipment using PLC
  • Clean Room For Final Product Handling (HVAC, HEPA Filter)
Equipment CMaterial Capacity(m3) No. of Units Design Temp.(0C) Design Press.(bar)
Batch reactor Glass-Lined 3.0 ~ 8.0 7 -25 ~ 220 0C FV ~ 6
316LSS 3.0 ~ 6.0 5 –25 ~ 220 0C FV ~ 7
Continuous Reactor 316LSS 110 L 2 RT ~ 200 0C 0 ~ 120
Filter Dryer 316LSS 3 4 -25 ~ 100 0C FV ~ 4

No.2 Plant

The No.2 plant was renovated in 2010 to produce commercial scale API product under full cGMP.

  • Production Start in 2003, Renovation in 2010, designed for API Manufacturing
  • 13 Batch Reactors (Total Capacity: 87m3)
  • Low Temperature Continuous Reaction System
  • Segregated Feeding Room for Hazardous Material Handling
  • Automatic Temperature & Pressure Control System for Plant Equipment using PLC
  • 4 Nutsche Filter Dryers in Clean Room
  • Clean Room (Grade D Air Control) for Filtering, Drying, Milling & Packaging
  • Co-Mill, Jet Mill (Explosion-Proof)
Equipment CMaterial Capacity(m3) No. of Units Design Temp.(0C) Design Press.(bar)
Batch reactor Glass-Lined 6.0 ~ 7.0 7 -25 ~ 220 0C FV ~ 5
316LSS 5.0 ~ 7.0 5 –25 ~ 220 0C FV ~ 40
Hastelloy-C 7.0 1 –25 ~ 220 0C 0 ~ 5
Continuous Reactor 316LSS+Hastelloy-C 1 L/min 2 -90 ~ 50 0C FV ~ 2
Filter Dryer 316LSS 3 2 -25 ~ 220 0C 0 ~ 4
Hastelloy-C 3 2 –25 ~ 100 0C FV ~ 4

No.3 Plant

The No.3 plant was specifically designed for continuous process.

  • Production Start in 2003
  • 3 Continuous Catalytic Hydrogenation Reactors (High Pressure Design, up to 330bar)
  • Continuous Dehydrogenation System (High Temperature Design, up to 600℃)
  • Continuous Esterification, Extraction and Distillation System
  • Fully Automated Process Control System (using DCS)
  • High Vacuum Distillation Equipment - Hybrid TFE & SPD
  • For the separation process of high boiling point and heat sensitive product
  • Purified Water System (Generation, Storage & Distribution System
  • USP Standard: Completion of PQ Phase I, II and III
  • On-line TOC analyzer, conductivity meter, RO & EDI system
  • Zero dead leg diaphragm valve, sanitary pump and material
  • Hot water sanitization function
  • Capacity: 1,000 L/hr

Contact Us